Eden Hills Slope
Stabilisation on Railway Cutting
Works undertaken; October 2002
The Works Included:
-
Stripping of vegetation and scaling of exposed faces
of approximately 7000m2 of rock face on two railway
cuttings in the Eden Hills area.
-
Installation of rock bolts to the rock faces at
heights above the ground of up to 30m.
-
Localised shotcreting to provide support for highly
unstable areas on rock face.
-
Installation of 7000m2 of rockfall protection mesh.
|
|
|
The Major Constraints of the Project Included:
Access to the site was available only from the train
cutting itself. This meant a strict timetable of works
needed to be adhered to in order to avoid disruption
to the rail services.
|
|
|