• Winner of Annual "Safety Gerry" Award Announced

    Congratulations to Geotech’s Ian Burns, who yesterday was announced as the winner of the annual “Safety Gerry” Award for FY17. Ian won for his commitment as a safety leader in his recently appointed role as Supervisor, and for embracing safety measures to support his crew. His is a good story too, having joined us some 10 years ago as a Trainee and, in a something good from something bad story, Read More
  • UoM Students Annual Visit to a Geotech Site

    This year's excursion for students and departmental staff from The University of Melbourne (UoM) was to New Charsfield apartments in St Kilda Rd, Melbourne, a project that comprises a 4-level basement car park, with 18 levels above ground. Geotech is engaged as the specialist subcontractor by Hamilton Marino Builders for the design & construction of the retention works (D-wall and temporary ground anchors) and the main CFA foundation piles. On Read More
  • ACCIONA Acquires Geotech Group

    Global infrastructure and renewable energy leader ACCIONA has made its first major investment in an Australian company with the acquisition of Victoria’s leading diversified civil engineering services business, Geotech Group. The transaction significantly strengthens ACCIONA’s construction business in Australia, a key strategic market that is poised for very strong growth. The investment will see the formation of a new company, ACCIONA Geotech Holding, bringing together ACCIONA’s future construction pipeline in Read More
  • Feel good story from CTD

    Nice photo taken near Murrumbeena Station as part of our works on the Caulfield to Dandenong: Level Crossing Removal Project. Our works there last week captured the attention of 3yo Eddy, who was passing by with mum and brother but stopped to watch our piling rig and excavator at work. Eddy became very chatty and during a break in works made radio calls to the idle plant operators, telling them Read More
  • Record depth 1200mm diam. piles at 1MQ

    Thanks to Operator Dylan Davis for sending these images through from our Melbourne Quarter – Commercial Tower One project for Lendlease. They are on the back of events from last Friday, when the Liebherr LB28 rig reached depths of 32.5m drilling 1200mm diam. piles, a record for the Group. Read More
  • Matt Sentry wins ANCOLD Award

    Belated congratulations to Geotech Civil's Matt Sentry, recently awarded the Young Professionals Best Paper at the ANCOLD (Australian National Committee On Large Dams Incorporated) 2016 Conference, held in Adelaide over 18-19 October. Read More
  • Launch of Directors' Safety Charter

    ON Thursday 21 July 2016, the Directors of the Geotech Group of companies launched their Safety Charter, demonstrating their collective commitment to sending every worker home safely to their families. The ceremony was attended by over 200 employees from the Melbourne Metro area, with the charter soon to be delivered to our projects in country Victoria and interstate. Company founder Gerry Noonan was guest of honour at the ceremony, where Read More
  • UoM Students Annual Visit to a Geotech Site

    This year’s excursion for students and departmental staff from The University of Melbourne (UoM) was to Coventry St. Apartments in South Melbourne, a project that comprises a 2-level basement car park, with 8 levels above ground and a rooftop garden terrace. Geotech was engaged as the specialist subcontractor by Figurehead Construction for the design & construction of the retention works including 78 no. soldier piles, temporary steel propping of adjoining Read More
  • University of Melbourne Students Annual Visit to a Geotech Site

    This year’s excursion for students and departmental staff from The University of Melbourne (UoM) was to Botanica Apartments at 188 Whitehorse Road, Balwyn, a project that comprises a 2-level basement car park on a 5,700m² site. Geotech was engaged as the specialist subcontractor by Hamilton Marino Builders for the design & construction of the retention works including soldier & foundation piling, temporary ground anchors and shotcrete infill panels. General Manager Read More
  • Icon Apartments, St Kilda

    Thousands of cars fly past 2 St Kilda Road heading south, just before it turns into Nepean Highway. Most wouldn’t even notice the sturdy and secure worksite fence, or even the tip-truck which waits on the footpath to receive its load of rock and dirt (the stuff that you end up with when you are digging an enormous hole). Lost in the dulcet tones of The Ox and Marco on Read More
  • Yallourn Weir Upgrade

    Project Summary Fabrication, Supply and Installation of 26no. 8 strand permanent GEGA anchors at up to 30m long. Design, construction and installation of a significant temporary coffer dam to protect the weir storage level to allow, Demolition and removal of the 30m wide steel drum gate. General reinforced concrete works, including installation of grouted cogged anchors into the foundation to allow construction of new concrete ogee crest of in place Read More
  • Our first Hole in One

      Geotech Drilling recently scored their first ‘hole-in-one’ at Anglo American’s Grasstree Mine site, when our 2,450m lateral well intersected our 408m deep vertical well on the first pass. This was achieved using Integrated Directional Services’ (IDS) Rotating Magnet Ranging Service (RMRS), which uses the rotation of a magnetic bit sub located directly behind the drill bit to create a time-varying magnetic field that can be detected up to 70 Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

 

  • 1
  • 2
  • 3

Geotech Group Youtube

  • Coleman Rail Officer Shutdown Stage 1
  • Coleman Rail Officer Shutdown Stage 2
  • Coleman Rail Domain Interchange