Disciplines

Gate improvement

A gated dam is built to enable the dam operator to have some control over the release of water. Once a gated dam reaches its Full Supply Level, the dam operator can control the release of water over the spillway using specially designed gates. These gated systems require maintenance or upgrades in order to meet current design requirements. 

Gate systems are also designed and installed into existing un-gated structures as a means for the existing structures to meet current design requirements. 

Get in touch, our office hours:
Mon - Fri 8:30 - 17:00

GEOTECH OFFICE LOCATIONS

HEAD OFFICE - MELBOURNE

174 Turner Street, Port Melbourne, VIC 3207

PERTH

Level 3, 195 Great Eastern Highway, Belmont, Western Australia 6104

+61 8 9488 8212

BRISBANE

Level 2, 100 Melbourne Street, South Brisbane, Queensland 4101

SYDNEY

Level 2, 55 Harrington Street, The Rocks, New South Wales 2000

Follow Us

Subscribe

You might like to get info, news, alerts from us...

Copyright © 2020 Geotechnical Engineering.

Search