Projects of

Infrastructure

Torrens Rail Junction Grade Separation, Adelaide SA

Torrens Rail Junction Grade Separation, Adelaide SA

  • Infrastructure

The Torrens Rail Junction is located in parklands around Port Road north of Adelaide. The separation of heavily utilised arterial roads from the suburban and freight train network was viewed as an infrastructure project of great benefit. 

Geotech was awarded critical packages of piling works involving continuous flight auger (CFA) retention piles and bridge foundation piles along the newly lowered rail alignment. The majority of the works were completed in two major rail occupations over the Easter and Queen’s Birthday weekends, including night works to minimise disruption to the metropolitan and ARTC rail lines.

 

Disciplines covered

  • CFA Piles – 450 No. 750-900mm dia x 22m

  • PDA load testing

Get in touch, our office hours:
Mon - Fri 8:30 - 17:00

GEOTECH OFFICE LOCATIONS

HEAD OFFICE - MELBOURNE

174 Turner Street, Port Melbourne, VIC 3207

PERTH

Level 3, 195 Great Eastern Highway, Belmont, Western Australia 6104

+61 8 9488 8212

BRISBANE

Level 2, 100 Melbourne Street, South Brisbane, Queensland 4101

SYDNEY

Level 2, 55 Harrington Street, The Rocks, New South Wales 2000

Follow Us

Subscribe

You might like to get info, news, alerts from us...

Copyright © 2020 Geotechnical Engineering.

Search